Waste collection

Planning and optimization of waste collection, recycling

Planning and optimization of waste collection

LOGISPLAN carries out the planning and optimization of the routes involved in the collection of waste from the multiple companies that generate it. That is, generating the optimal routes to later be able to generate the service sheets.

LOGISPLAN takes into account all the conditions and requirements that are common in this business, among them we can list the following:

Characteristics

  • Planning automation: Planning is achieved optimally without the need for fixed zone assignments or manual assistance.
  • Optimization of the use of the fleet, as a consequence, it is possible to lower costs and maximize the filling of vehicles.
  • Compliance with schedules required by customers, to avoid making pickups at times that are not desired.
  • Limitation of access to certain clients or areas for certain types of vehicles.
  • Possibility of simulation and analysis of various scenarios (eg eliminating pre-assigned distribution areas).
  • Technical characteristics such as side, front loading, crane, etc.
  • Distinction of the type of waste, since not all vehicles are adapted according to which container.
  • Control of incompatibilities between certain of the wastes.
  • Daily, weekly or monthly schedules.
  • Control of holidays.
  • Variable volumes per days, in this way, volume growth is simulated due to not carrying out the collection on the day.
  • Internal configuration to be able to adjust the speeds according to the time of day, thus allowing to control time slots where the traffic is denser.
  • Percentage speed settings depending on the area.
  • Integration with any ERP of the company, among others SAP, AS / 400, Navision, etc. and to any database on any other system.
  • Integration with GPS-based fleet management systems.

LOGISPLAN It is implemented in different types of companies in the recycling sector, planning and optimizing the routes of this channel, facilitating this complex task that requires many hours of work if it is to be carried out manually.